Base
| Electric RWD Long Range | Silver Frost
waited 3 months
Order : 22/12/2025 | Delivery : 01/04/2026
Details from JOSEP :
Sigo esperando, me han dicho que tengo un numero de bastidor asignado. Pero yo no se cual es. Que significa que tengo un numero de bastidor asignado?
📅 JOSEP's Order History
28/05/2026 :
me lo entregaron el dia 1 de abril
💬 Comments
From François de Delais.fr
Post a comment
From : You
Only participants in the delivery deadline tracking can leave a comment.
To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page.
Initial delivery period of 3 months
JOSEP had chosen the Xpeng G6, a highly sought-after model, on 22/12/2025. At the time of purchase, he was given a delivery date of 25/03/2026. This represented an initial delivery period of three months, a duration quite typical for such a vehicle 👍
A delivery perfectly on time !
This timeframe could raise questions among future buyers about Xpeng's delivery schedule management, especially for a model as popular as the G6. Fortunately, JOSEP's experience can provide reassurance on this point. Xpeng handled it well 👍
In fact, JOSEP waited 3 months
JOSEP ordered their Xpeng G6 in Spain
on 22/12/2025. At the time of their order, the initially announced delivery date was 25/03/2026, which was an initial delivery time of 3 months. In the end, JOSEP took possession of the vehicle on 01/04/2026, which resulted in a waiting time of 3 months.






