Super comfort but central shelf from another era
Shine Pack
| Plug-In Hybrid 225ch | Perla Nera Black |
on 20/10/2023
waited 19 months
Order : 30/06/2022 | Delivery : 22/01/2024
on 26/01/2024
Details from PLC :
Park assist / black rims / electric tailgate / induction charger (GSM) / Professional vehicle color pack
Not delivered with black rims
The induction charger heats up too much and puts the iPhone in safety
Very slow charging
Load 3h 11kw
Charge 12h 220v
💬 Comments
From François de Delais.fr
On : 22/01/2024
Post a comment
From : You
Only participants in the delivery deadline tracking can leave a comment.
To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page.
Expected delivery period of 6 months
When PLC ordered his Citroën C5 Aircross on 30/06/2022, he was filled with excitement and anticipation 😉 The initially announced delivery date of 30/12/2022, a standard six months delivery period, seemed reasonable for such a sought-after model.
A delivery delayed by 13 months
For PLC, the delivery of his Citroën C5 Aircross was postponed by more than thirteen months. Such delays, though quite unusual, can be attributed to various factors beyond the manufacturer's direct control (supply chain issues with components, global logistical challenges...).
In fact, PLC waited 19 months
PLC ordered their Citroën C5 Aircross in France
on 30/06/2022. At the time of their order, the initially announced delivery date was 30/12/2022, which was an initial delivery time of 6 months. In the end, PLC took possession of the vehicle on 22/01/2024, which resulted in a waiting time of 19 months.
See the other Citroën C5 Aircross deliveries
on 20/10/2023
on 26/01/2024


















