Honda e:Ny1
Adsance
BEV 204ch
Rouge Vermillon
Initial delivery period of 2 months
Powermaxx had opted for the Honda e:Ny1 on 30/09/2023. When purchasing, he was initially given a delivery date of 20/11/2023, equating to a two months delivery period.
A delivery delayed by 1 month
In Powermaxx's case, his Honda e:Ny1 was delivered with a slight one month delay, on 19/12/2023. Although rare, this delay remained within a reasonable timeframe. Honda still managed well.
In fact, Powermaxx waited 3 months
Powermaxx ordered their Honda e:Ny1 in France on 30/09/2023. At the time of their order, the initially announced delivery date was 20/11/2023, which was an initial delivery time of 2 months. In the end, Powermaxx took possession of the vehicle on 19/12/2023, which resulted in a waiting time of 3 months.