
1

Peugeot Rifter
GT

130 EAT8

Kiama Blue
👉 Cri84250 is an English speaker; you cannot leave him a message on this page in French !
Initial delivery period of 5 months
Cri84250 had opted for the Peugeot Rifter on 14/09/2024. When purchasing, he was initially given a delivery date of 20/02/2025, equating to a five months delivery period.
A delivery delayed by 2 months
In Cri84250's case, his Peugeot Rifter was delivered with a slight two months delay, on 29/04/2025. Although rare, this delay remained within a reasonable timeframe. Peugeot still managed well.
In fact, cri84250 waited 7 months
Cri84250 ordered their Peugeot Rifter in France on 14/09/2024. At the time of their order, the initially announced delivery date was 20/02/2025, which was an initial delivery time of 5 months. In the end, Cri84250 took possession of the vehicle on 29/04/2025, which resulted in a waiting time of 7 months.
See the other Peugeot Rifter deliveries
Previous delivery
on 08/04/2025
on 08/04/2025
No photographed Peugeot Rifter delivered more recently
×