
2

Peugeot 2008
GT

136 e-DCS6

Selenium Grey
👉 Soph57 is an English speaker; you cannot leave him a message on this page in French !
Initial delivery period of 3 months
Soph57 had opted for the Peugeot 2008 on 29/10/2024. When purchasing, he was initially given a delivery date of 23/01/2025, equating to a three months delivery period.
A delivery delayed by 3 months
In Soph57's case, his Peugeot 2008 was delivered with a slight three months delay, on 23/04/2025. Although rare, this delay remained within a reasonable timeframe. Peugeot still managed well.
In fact, Soph57 waited 6 months
Soph57 ordered their Peugeot 2008 in Luxembourg on 29/10/2024. At the time of their order, the initially announced delivery date was 23/01/2025, which was an initial delivery time of 3 months. In the end, Soph57 took possession of the vehicle on 23/04/2025, which resulted in a waiting time of 6 months.
See the other Peugeot 2008 deliveries
Previous delivery
on 10/02/2025
on 10/02/2025
No photographed Peugeot 2008 delivered more recently
×