

Renault Megane E-Tech
Iconic

EV60 220ch optimum charge

Ceramic Grey
Initial delivery period of 2 months
Sdup had opted for the Renault Megane E-Tech on 15/01/2023. When purchasing, he was initially given a delivery date of 28/03/2023, equating to a two months delivery period.
A delivery delayed by 1 month
In Sdup's case, his Renault Megane E-Tech was delivered with a slight one month delay, on 13/04/2023. Although rare, this delay remained within a reasonable timeframe. Renault still managed well.
In fact, Sdup waited 3 months
Sdup ordered their Renault Megane E-Tech in France on 15/01/2023. At the time of their order, the initially announced delivery date was 28/03/2023, which was an initial delivery time of 2 months. In the end, Sdup took possession of the vehicle on 13/04/2023, which resulted in a waiting time of 3 months.
See the other Renault Megane E-Tech deliveries
on 11/04/2023
on 24/04/2023