Note on naming: In French, « délais » means delivery timeframes, not « delayed ». This community-driven site provides statistical estimates based on user reports. For official delivery dates, please consult your dealership.
FR
EN

Details of delivery times shared for Dacia Spring

  1. Home
  2. Dacia
  3. Dacia Spring
  4. In detail
Delivery times Dacia Spring

👉 To obtain a summary of this data, please refer to the synthetic statistical data

Filter the data


📊 The Dacia Spring Patience Map

Where does your order stand compared to market reality? Facing production lines and this model's specific constraints, this unique crowd-sourced chart aggregates and analyzes real delivery times experienced by the community in real time.
💡 A clear trend is emerging! Feel free to share this chart to grow the community and sharpen our insights!

🟢 Delivered ⭐ Delivered (with photo) ⚫ Pending

Delais.fr

Filter the data

The comments are visible to participants after logging into their personal space. To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page..

Model Engine Ordered on Delivered on
██ Spring Essential
de floeric (Valenciennes)
Electric
65
26/02/2026
4 months announced
⏱️ Not yet
checked on 07/04/2026
██ Spring Essential
de MWG (Lens)
Electric
45
28/12/2025
4 months announced
⏱️ Not yet
checked on 19/05/2026
Spring of Myckes95
Spring Extreme
de Myckes95
Electric
65
30/08/2025
3 months announced
11/12/2025
OK = 3 months observed
██ Spring Extreme
de damdam9412
Electric
65
19/12/2024
5 months announced
26/06/2025
+1 = 6 months observed
██ Spring Extreme
de Marc72
Electric
65
28/11/2024
5 months announced
11/04/2025
-1 = 4 months observed
Spring of Luckyco
Spring Extreme
de Luckyco

💬 « Hello, I took as options: the roof bars, the central armrest and the front parking aid. » 
Luckyco wrote this comment on 28/05/2025.
20/01/2025 : The status of my order has changed to "Manufacturing" and the deadline indicated is: from May 5 to 18, 2025
19/03/2025 : The status of my order has changed to "Transport" and the deadline indicated is: from March 31 to April 13, 2025...
Electric
65
18/11/2024
7 months announced
28/05/2025
-1 = 6 months observed
██ Spring Extreme
de Ro_Drcl
Electric
65
31/10/2024
6 months announced
23/12/2024
-4 = 2 months observed
██ Spring Extreme
de BEN

💬 « After testing this Spring phase 2, I had my Spring Essential reused! Delivered on March 3, 2025: and I don't regret it, everything is better and that's more than enough for me and it's reliable DACIA!! » 
BEN wrote this comment on 03/03/2025.
Electric
65
30/10/2024
4 months announced
03/03/2025
OK = 4 months observed
██ Spring Essential
de ricoul
Electric
45
26/10/2024
5 months announced
25/04/2025
+1 = 6 months observed
██ Spring Extreme
de ruzthi
Electric
65
24/10/2024
5 months announced
26/02/2025
-1 = 4 months observed
██ Spring Extreme
de CG
Electric
65
24/10/2024
6 months announced
26/02/2025
-2 = 4 months observed
██ Spring Extreme
de jide33
Electric
65
27/06/2024
5 months announced
18/11/2024
OK = 5 months observed

Table legend

Each row corresponds to a participant, find : :
- on a white background, the vehicles that have not been delivered yet
- on  green background  delivered cars
- on  red background  canceled orders
- on  yellow backgroubd  the comments left by the participants

A delivered vehicle ✔️, or an undelivered vehicle whose scheduled delivery date has not yet passed at the time of recording✔️ , or an undelivered vehicle whose scheduled delivery date has passed, but the information has been updated and confirmed within the past 2 months, is considered a reliable record.

The comments are visible to participants after logging into their personal space. To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page..

Most popular car models tracked over the last 3 months

Average waiting delivery time for Tesla Model Y
Tesla Model Y

Lead Time ± 3 months
(465 orders)
Average waiting delivery time for Renault 5
Renault 5

Lead Time ± 3 months
(367 orders)
Average waiting delivery time for Peugeot 5008
Peugeot 5008

Lead Time ± 10 months
(394 orders)
Average waiting delivery time for Škoda Elroq
Škoda Elroq

Lead Time ± 4 months
(152 orders)
Average waiting delivery time for Peugeot 3008
Peugeot 3008

Lead Time ± 7 months
(918 orders)
Average waiting delivery time for Renault Scenic E-Tech
Scenic E-Tech

Lead Time ± 3 months
(343 orders)
Average waiting delivery time for Dacia Sandero
Dacia Sandero

Lead Time ± 2 months
(552 orders)
Average waiting delivery time for Renault Twingo
Renault Twingo

Lead Time ± 3 months
(93 orders)
Average waiting delivery time for Citroën C3
Citroën C3

Lead Time ± 5 months
(838 orders)
Average waiting delivery time for Alpine A290
Alpine A290

Lead Time ± 4 months
(140 orders)
Average waiting delivery time for BMW iX3
BMW iX3

Lead Time ± 6 months
(63 orders)
Average waiting delivery time for Citroën C3 Aircross
C3 Aircross

Lead Time ± 6 months
(251 orders)
Zoomed Image ×
×

Contact-me !

Is there missing information ? Did you notice a bug or an error ? Thank you ! 👍