in June 1972 my first R5 and in January 2025 the circle closes...
Techno
| Electric 150ch - 52kWh | Diamond Black |
on 24/12/2024
waited 2 months
Order : 21/10/2024 | Delivery : 02/01/2025
on 10/01/2025
Details from ejk64 :
delivery confirmation January 2, 2025
r5 eco mode test on the road...
a first trip from Pau to Auch, 210 km.a/r, on roads, temperature 10°, eco mode without air conditioning or heating...
departure at 98% battery for arrival at 34%, and according to the on-board computer a consumption of 14.3 kw/100kms.
This seems to be normal in real life, i.e. a range of 340 km. on the road.
I did not use the "B" mode of the switch, because I do not understand its usefulness...
r5 eco mode test on highway...
100 km of Béarnaise motorway, eco mode therefore 115 km/h maximum, temperature 18° therefore neither air conditioning nor heating.
the on-board computer tells me 15.4 kWh/100 km, and after recharging (for the pleasure of learning) at 50% a range of 175 km, which would be 350 km at 100%
📅 Ejk64's Order History
21/10/2024 :
order and signature LOA
13/12/2024 :
r5 techno manufactured and delivered between December 30 and January 12, 2025
20/12/2024 :
this day,
presentation of my black r5 in the dealership parking lot awaiting delivery on January 2, 2025....
02/01/2025 :
delivery this January 2, 2025...
💬 Comments
From ejk64 on 19/12/2024 18:13 the owner
Renault 5 150ch - 52kWh Techno Diamond Black
✔️ delivered on 02/01/2025 in 2 months
From ejk64 on 14/12/2024 09:55 the owner
Renault 5 150ch - 52kWh Techno Diamond Black
✔️ delivered on 02/01/2025 in 2 months
From François de Delais.fr
On : 02/01/2025
Post a comment
From : You
Only participants in the delivery deadline tracking can leave a comment.
To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page.
Initial delivery period of 3 months
Ejk64 had chosen the Renault 5, a highly sought-after model, on 21/10/2024. At the time of purchase, he was given a delivery date of 03/02/2025. This represented an initial delivery period of three months, a duration quite typical for such a vehicle 👍
Delivery 1 month ahead of schedule !
This timeframe could raise questions among future buyers about Renault's delivery schedule management, especially for a model as popular as the Renault 5. Fortunately, Ejk64's experience can provide reassurance on this point. Renault handled it well 👍
In fact, ejk64 waited 2 months
Ejk64 ordered their Renault 5 in France
on 21/10/2024. At the time of their order, the initially announced delivery date was 03/02/2025, which was an initial delivery time of 3 months. In the end, Ejk64 took possession of the vehicle on 02/01/2025, which resulted in a waiting time of 2 months.
See the other Renault 5 deliveries
on 24/12/2024
on 10/01/2025

























































