Note on naming: In French, « délais » means delivery timeframes, not « delayed ». This community-driven site provides statistical estimates based on user reports. For official delivery dates, please consult your dealership.
FR
EN

Details of delivery times shared for Dacia Jogger

  1. Home
  2. Dacia
  3. Dacia Jogger
  4. In detail
Delivery times Dacia Jogger

👉 To obtain a summary of this data, please refer to the synthetic statistical data

Filter the data


.

🏆
🧘‍♀️ Steph-Devi
ℹ️ How to read this graph ?
The trophy for the most patient future owner who has not yet received their Dacia Jogger and is participating in this collaborative tracking tool goes to Steph-Devi who has been waiting for his car for 0 months, he had ordered it on the 25/01/2026 (he confirmed it to us again on 28/01/2026).

Filter the data

The comments are visible to participants after logging into their personal space. To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page..

Model Engine Ordered on Delivered on
██ Jogger Extreme 5 Places
de Steph-Devi
Hybrid
Eco-G 120
25/01/2026
4 months announced
⏱️ Not yet
checked on 28/01/2026
Jogger of brian06
Jogger Extreme 7 Places
de brian06

💬 « Car was ordered on 5th Aug. It arrived in UK on 30th September. It was at my dealers by 6th October and I collected it on Friday the 10th October. Very happy. Nine weeks from order to delivery. » 
brian06 wrote this comment on 11/10/2025.
Gasoline
TCe 110
05/08/2025
3 months announced
10/10/2025
-1 = 2 months observed
██ Jogger Extreme+ 5 Places
de Ally2000
Hybrid
140
30/07/2025
3 months announced
28/10/2025
OK = 3 months observed
██ Jogger Extreme+ 7 Places
de Fred
Hybrid
140
15/04/2025
2 months announced
04/07/2025
+1 = 3 months observed
██ Jogger Extreme+ 5 Places
de Rb
Hybrid
140
04/04/2025
1 months announced
14/05/2025
OK = 1 months observed
██ Jogger Extreme 5 Places
de tac
Gasoline
TCe 110
27/02/2025
4 months announced
12/05/2025
-2 = 2 months observed
██ Jogger Expression 7 Places
de Biloute
Hybrid
140
14/02/2025
2 months announced
29/04/2025
OK = 2 months observed
██ Jogger Extreme 7 Places
de Bulladin
Hybrid
140
28/01/2025
4 months announced
01/07/2025
+1 = 5 months observed
██ Jogger Extreme+ 7 Places
de Flo
Hybrid
140
20/01/2025
3 months announced
10/04/2025
OK = 3 months observed
Jogger of Kecoche
Jogger Extreme 7 Places
de Kecoche
Hybrid
140
19/01/2025
2 months announced
29/03/2025
OK = 2 months observed
██ Jogger Extreme+ 5 Places
de lionel
Hybrid
Eco-G 100
11/12/2024
3 months announced
07/03/2025
OK = 3 months observed
Jogger of melasyl
Jogger Expression 7 Places
de melasyl

💬 « I was told that my deadline was very long since I was a company car in a company fleet: no priority! » 
melasyl wrote this comment on 08/06/2025.
Gasoline
TCe 110
29/11/2024
5 months announced
15/07/2025
+2 = 7 months observed
██ Jogger Extreme+ 5 Places
de patcoublevie
Hybrid
140
27/11/2024
2 months announced
04/03/2025
+1 = 3 months observed
██ Jogger Expression 5 Places
de e1000
Hybrid
140
25/11/2024
2 months announced
18/02/2025
+1 = 3 months observed
██ Jogger Expression 5 Places
de BenATReptar

💬 « Pack City (Camera) Swan neck hitch » 
BenATReptar wrote this comment on 18/05/2025.
14/12/2024 : Transition to manufacturing in monitoring
26/01/2025 : Transition to shipping in tracking
02/02/2025 : Passage in transport in tracking
10/02/2025 : Arrival in Fos Sur Mer (information from the dealer)
21/02/2025 : Date of the registration document
12/03/2025 : Departure from Fos sur Mer towards Quincieux (Lyon storage)
20/03/2025 : Transition in preparation
Hybrid
Eco-G 100
23/11/2024
4 months announced
21/03/2025
OK = 4 months observed
██ Jogger Extreme 5 Places
de Juan
Hybrid
140
14/11/2024
3 months announced
10/12/2024
-2 = 1 months observed
██ Jogger Essential 7 Places
de Countryboy
Hybrid
140
24/10/2024
2 months announced
14/12/2024
OK = 2 months observed
██ Jogger Expression 5 Places
de Titi

💬 « Hybrid jogger vehicle being transported to the dealership » 
Titi wrote this comment on 23/01/2025.
Hybrid
140
14/10/2024
4 months announced
27/01/2025
-1 = 3 months observed
██ Jogger Extreme 5 Places
de J’mt
Hybrid
Eco-G 100
13/10/2024
2 months announced
26/12/2024
OK = 2 months observed
██ Jogger Extreme 7 Places
de Jogger78
Hybrid
140
02/10/2024
4 months announced
06/01/2025
-1 = 3 months observed
██ Jogger Extreme 5 Places
de Jerre
Gasoline
TCe 110
28/09/2024
4 months announced
14/03/2025
+1 = 5 months observed
Jogger of DAMIEN761
Jogger Extreme+ 5 Places
de DAMIEN761
Gasoline
TCe 110
15/09/2024
3 months announced
18/11/2024
-1 = 2 months observed
Jogger of Anzelik88
Jogger Expression 5 Places
de Anzelik88
Hybrid
Eco-G 100
14/09/2024
1 months announced
08/11/2024
+1 = 2 months observed
██ Jogger Extreme+ 5 Places
de berry

💬 « 23/8/24 ordered 20/9/24 beginning production 13/11/24 ready hor transport 14/11/24 transport 5/12/24 arrival and préparation 13/12/24 garage called me the car is deliverd and we set the appointment for pick up on 19/12/24 » 
berry wrote this comment on 30/12/2024.
Gasoline
TCe 110
23/08/2024
4 months announced
19/12/2024
OK = 4 months observed
██ Jogger Expression 7 Places
de Artur

💬 « Ordered the car on the 14th of july 2024 and received it on the 11/10/2024 » 
Artur wrote this comment on 15/10/2024.
Hybrid
Eco-G 100
15/07/2024
3 months announced
11/10/2024
OK = 3 months observed
██ Jogger Expression 7 Places
de Rob wilkinso...
Gasoline
TCe 110
09/07/2024
3 months announced
10/09/2024
-1 = 2 months observed
██ Jogger Extreme+ 5 Places
de Baerfaby

💬 « Options: hitch and sleep pack. No discounts. » 
Baerfaby wrote this comment on 13/11/2024.
Hybrid
Eco-G 100
05/07/2024
4 months announced
13/11/2024
OK = 4 months observed
██ Jogger Extreme+ 7 Places
de JustJesta

💬 « ordered in june with an original due date of september, then changed to mid november, now changed to mid december, this is a Motability car 31/10 update, car is now at the Import Center, hopefully i will have it soon, dealer has told me its december midway through but im hoping its alot sooner! » 
JustJesta wrote this comment on 13/11/2024.
13/11/2024 : Had a call today, the car arrived today at the dealership and will be ready for the collection next Wednesday woohoo it feels like it's taken forever but thankfully that's it here
Hybrid
140
30/06/2024
5 months announced
20/11/2024
OK = 5 months observed
██ Jogger Extreme 7 Places
de Prudos

💬 « New generation car with GSR2 Delivered in advance, a lot in advance, on August 20th instead of October 30th. » 
Prudos wrote this comment on 21/10/2024.
Hybrid
Eco-G 100
14/06/2024
5 months announced
20/08/2024
-3 = 2 months observed
██ Jogger Extreme 5 Places
de Ludo33185
Hybrid
140
14/06/2024
6 months announced
31/08/2024
-3 = 3 months observed
Jogger of Li
Jogger Extreme 5 Places
de Li

💬 « order dated 06/12/2024 with delivery by 11/30/2024. as of 08/08/24: on my.dacia website delivery was estimated between 9/9 and 9/22/24. on 10/09 the vehicle was at the dealership, we could have received it but we preferred that the hitch be mounted, hence the delivery on 27/09 so as not to have to return to the garage. We are happy to have had our vehicle in advance, to be honest we didn't really believe it! It's nice to have some good news!!! Good luck to everyone » 
Li wrote this comment on 03/10/2024.
31/07/2024 : on mydacia as of 07/20 estimated delivery between 9/16 & 9/29 the vehicle is manufactured
31/07/2024 : on mydacia on 30/07 delivery estimated between 2/9 & 22/9 the vehicle is handed over to the carrier
28/08/2024 : The vehicle is being prepared
09/09/2024 : The vehicle is at the dealership! All that remains is the hitch to be assembled and the registration to be done.
Hybrid
Eco-G 100
12/06/2024
6 months announced
27/09/2024
-2 = 4 months observed
██ Jogger Extreme+ 7 Places
de Richardl

💬 « Wonderful car no complaints herr » 
Richardl wrote this comment on 19/01/2026.
Hybrid
140
04/06/2024
3 months announced
19/09/2024
+1 = 4 months observed
██ Jogger Essential 5 Places
de Lio
Hybrid
Eco-G 100
29/05/2024
3 months announced
23/07/2024
-1 = 2 months observed
██ Jogger Essential 5 Places
de Phenix
Hybrid
140
06/05/2024
3 months announced
⏱️ Not yet
❌ Order canceled
Jogger of Lowrider
Jogger Extreme 7 Places
de Lowrider

💬 « Ordered Dacia jogger hybrid Extreme. Initial deadline end of June then end of July. Still not received… and the VIN number no longer gives any information…. I have not heard from Dacia Switzerland customer service. Basically, no one knows where my car is… » 
Lowrider wrote this comment on 22/02/2025.
25/09/2024 : Today we just found the trace of my car, after 3 “insistent” calls to customer service. Initial deadline end of July. It will end at the end of October if all goes well. No commercial gesture at the moment, to be defined once the vehicle has been received.
02/10/2024 : I am told that the deadline of the end of October cannot be met. It should have been in production on September 25 and is still not there today...
22/10/2024 : Great progress! My vehicle is on its way to Switzerland! It should be delivered to the garage next week
Hybrid
140
29/04/2024
3 months announced
06/11/2024
+3 = 6 months observed
Jogger of Evush
Jogger Extreme+ 7 Places
de Evush
Hybrid
140
24/04/2024
3 months announced
15/07/2024
OK = 3 months observed
██ Jogger Extreme+ 5 Places
de Sesaine34

💬 « Extreme jogger plus 5 seats without add-on option » To see the full comment, you too should participate !
Sesaine34 wrote this comment on 29/03/2025.
17/06/2024 : The vehicle is manufactured completely
25/06/2024 : No news yet
02/07/2024 : Vehicle returned to carrier
04/07/2024 : Receipt of vehicle registration document
Hybrid
Eco-G 100
20/04/2024
3 months announced
⏱️ Not yet
❌ Order canceled
██ Jogger Extreme+ 5 Places
de Jooo

💬 « I could have been delivered a week earlier but I was not available » 
Jooo wrote this comment on 06/08/2024.
Hybrid
Eco-G 100
13/04/2024
4 months announced
06/08/2024
OK = 4 months observed
██ Jogger Extreme 7 Places
de Mielu
Hybrid
140
08/04/2024
3 months announced
30/07/2024
+1 = 4 months observed
██ Jogger Extreme 7 Places
de Mielu.lux

💬 « Received the vehicle on 07/30/2024 Scheduled for 07/20/2024 The vehicle arrived on 07/11 at the dealership, until 07/21 no one has to touch to add the additional options. On the 29th I requested a copy of the registration document to be able to obtain insurance. On the 30th, upon receipt of the vehicle, everything was thrown into the trunk. the 2 rear seats the houses the tow hook etc. Good time off for a trainee who prepares the car :-) At home noticed that the sun visors were not in the trunk nor mounted, no key to remove the luggage rack, the telephone support. already go up to this place no cache here wants it removed. This morning when opening the trunk I heard a little noise of a screw moving around in the door when you open or close it. Returned to the dealership this morning » 
Mielu.lux wrote this comment on 31/07/2024.
Hybrid
140
08/04/2024
3 months announced
30/07/2024
+1 = 4 months observed
██ Jogger Expression 7 Places
de Sorcier

💬 « Very satisfied with my jooger and very economical because I always run on LPG » 
Sorcier wrote this comment on 01/10/2024.
Hybrid
Eco-G 100
06/04/2024
4 months announced
21/06/2024
-2 = 2 months observed
██ Jogger Expression 7 Places
de Pixou
Hybrid
Eco-G 100
02/04/2024
2 months announced
20/06/2024
+1 = 3 months observed
Jogger of Carole
Jogger Extreme+ 7 Places
de Carole

💬 « Hello, We called the first time on May 31st, the answer was "your car is being delivered". Second call on June 15, “your car is being delivered to Montpellier, it will take a few days”. Text today “Your car will arrive at the end of next week, we’ll call you!” Amended, as they say at home, you tell me 6 months on the day of the order, but you don't take me for a fool every time I call you! Continued in the next issue.. Edit: it's July 5th and we got our Jogger back, relieved and delighted » 
Carole wrote this comment on 05/07/2024.
Hybrid
Eco-G 100
30/03/2024
2 months announced
05/07/2024
+1 = 3 months observed
██ Jogger Extreme 5 Places
de Girasol
Hybrid
140
30/03/2024
4 months announced
04/07/2024
-1 = 3 months observed
██ Jogger Extreme 7 Places
de Luthias
Hybrid
140
25/03/2024
6 months announced
07/08/2024
-2 = 4 months observed
██ Jogger Extreme 7 Places
de shirius
Hybrid
140
19/03/2024
4 months announced
01/06/2024
-2 = 2 months observed
██ Jogger Extreme+ 5 Places
de cousin93
Hybrid
140
16/03/2024
5 months announced
⏱️ Not yet
❌ Order canceled
██ Jogger Expression 5 Places
de Jmg

💬 « It still hasn't arrived, perhaps around July 25. It is in the preparation phase » 
Jmg wrote this comment on 01/08/2024.
Hybrid
Eco-G 100
16/03/2024
4 months announced
31/07/2024
+1 = 5 months observed
██ Jogger Extreme 7 Places
de JulMat38
Hybrid
140
14/03/2024
2 months announced
30/05/2024
+1 = 3 months observed
██ Jogger Extreme 7 Places
de cecam
Hybrid
140
09/03/2024
3 months announced
05/10/2024
+4 = 7 months observed
██ Jogger Expression 7 Places
de moomin
Hybrid
140
02/03/2024
5 months announced
02/07/2024
-1 = 4 months observed
██ Jogger Expression 5 Places
de Dersouzala
Gasoline
TCe 110
29/02/2024
3 months announced
14/06/2024
OK = 3 months observed
██ Jogger Extreme 5 Places
de Enitsed
Hybrid
140
29/02/2024
3 months announced
29/05/2024
OK = 3 months observed
██ Jogger Expression 7 Places
de Maher41
Hybrid
140
24/02/2024
4 months announced
10/05/2024
-2 = 2 months observed
██ Jogger Extreme 7 Places
de Meyer
Hybrid
140
17/02/2024
4 months announced
03/05/2024
-2 = 2 months observed
██ Jogger Extreme+ 7 Places
de Alf
Hybrid
140
15/02/2024
5 months announced
13/07/2024
OK = 5 months observed
██ Jogger Extreme 5 Places
de Kevin65

💬 « Hello, I called Dacia today my vehicle has been in their parking lots for 2 days I had a feeling! When I ordered the original I took the trailer hitch, meaning it's not factory and that's what I thought so I insisted on having it tomorrow without a trailer hitch otherwise their workshops plan to only put the trailer hitch on me in 15 days because they have too much work. He wanted to deliver it to me after May 14…. So I will make an appointment later without paying + the trailer hitch. » 
Kevin65 wrote this comment on 21/06/2024.
10/04/2024 : Still waiting, it has been in production since yesterday morning...
Gasoline
TCe 110
13/02/2024
2 months announced
03/05/2024
+1 = 3 months observed
Jogger of loulou
Jogger Extreme 7 Places
de loulou

💬 « theoretical delivery, today 02/17 no order displayed on my mydacia account 02/22 Access to my order on mydacia, delivery estimated between May 6 and May 19, 2024 20/04 the car is manufactured and awaiting transport (Source Mydacia.ro) delivery estimated between May 13 and May 26 » 
loulou wrote this comment on 03/06/2024.
22/02/2024 : Access to my order on mydacia, delivery estimated between May 6 and May 19, 2024
21/05/2024 : delivery on May 23.
23/05/2024 : vehicle delivery
Hybrid
Eco-G 100
07/02/2024
5 months announced
23/05/2024
-2 = 3 months observed
Jogger of Charlie
Jogger Extreme+ 7 Places
de Charlie
Hybrid
140
06/02/2024
3 months announced
17/06/2024
+1 = 4 months observed

Table legend

Each row corresponds to a participant, find : :
- on a white background, the vehicles that have not been delivered yet
- on  green background  delivered cars
- on  red background  canceled orders
- on  yellow backgroubd  the comments left by the participants

A delivered vehicle ✔️, or an undelivered vehicle whose scheduled delivery date has not yet passed at the time of recording✔️ , or an undelivered vehicle whose scheduled delivery date has passed, but the information has been updated and confirmed within the past 2 months, is considered a reliable record.

The comments are visible to participants after logging into their personal space. To have a personal space, you must participate in the follow-up by adding information about your own order by visiting this link. If you are already participating but have lost your personal link, you can retrieve it by visiting this page..

The most tracked models in the last 3 months

Tesla Model YTesla Model Y
⏱️ ± 2 months
(319 👨‍👩‍👧‍👦)
Peugeot 5008Peugeot 5008
⏱️ ± 8 months
(372 👨‍👩‍👧‍👦)
Citroën C3Citroën C3
⏱️ ± 7 months
(811 👨‍👩‍👧‍👦)
Renault 5Renault 5
⏱️ ± 2 months
(309 👨‍👩‍👧‍👦)
Peugeot 3008Peugeot 3008
⏱️ ± 8 months
(894 👨‍👩‍👧‍👦)
Dacia BigsterDacia Bigster
⏱️ ± 4 months
(206 👨‍👩‍👧‍👦)
 C3 Aircross C3 Aircross
⏱️ ± 6 months
(231 👨‍👩‍👧‍👦)
 Scenic E-Tech Scenic E-Tech
⏱️ ± 3 months
(306 👨‍👩‍👧‍👦)
Škoda ElroqŠkoda Elroq
⏱️ ± 3 months
(117 👨‍👩‍👧‍👦)
Škoda EnyaqŠkoda Enyaq
⏱️ ± 4 months
(296 👨‍👩‍👧‍👦)
Alpine A290Alpine A290
⏱️ ± 6 months
(115 👨‍👩‍👧‍👦)
DS N°8DS N°8
⏱️ ± 10 months
(31 👨‍👩‍👧‍👦)
Zoomed Image ×
×

Contact-me !

Is there missing information ? Did you notice a bug or an error ? Thank you ! 👍